TBM for Chinese metro designed and built in five months

A 148m-long double-shield tunnel boring machine (TBM) for a Chinese metro line has been designed and manufactured in just five months.

A 148m-long double-shield tunnel boring machine (TBM) for a Chinese metro line has been designed and manufactured in just five months.

Read Full Article: The Construction Index

Source: http://www.theconstructionindex.co.uk/feeds/news.xml

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.